StaffordshireTech News
Investment

Lucideon sets out £500m plan to make advanced ceramic parts at Keele

The Stone-based materials company wants to build a UK manufacturing and research centre for ceramic matrix composites on Keele's science park, but the plan depends on just over £200 million of government money that had not been confirmed when the plan was announced.

Illustration: Investment, Keele

The Potteries has been firing clay for centuries, and the next chapter in that story could be written a few miles up the road at Keele. Lucideon, a materials technology company headquartered in Stone, has set out plans for a centre costing more than £500 million to make ultra-tough ceramic parts for aerospace, space and nuclear energy, with a site earmarked on Keele University's Science and Innovation Park.

The plan was announced in a press release published by Keele University, which owns the science park where the centre would sit. The release relies on statements from Lucideon, the park and a ceramics trade body, all of which support the plan. It includes no response from government and no independent assessment, so the figures below are the backers' own. Lucideon's earlier published material and Companies House records add some background.

What it would make

The centre would make ceramic matrix composites, known as CMCs. These are ceramics with ceramic fibres running through them, a mix that keeps them light while letting them survive extremely high temperatures and sudden heat or impact without shattering. The announcement describes them as increasingly sought after around the world, and says the UK currently lacks a secure domestic supply.

Advert spaceWant your ad here?300 × 250 boxEnquire about this space →

Lucideon's chief executive, Tony Kinsella, described this as a market failure. He said sectors including aerospace, space and nuclear energy lack a sovereign, meaning UK-based, manufacturing capability, leaving supply chains exposed and creating risks to energy and wider security. He said a UK facility would reduce dependence on international supply chains, create high-value jobs and boost competitiveness in the Midlands. "It’s an ambitious plan, which builds on the history and expertise of ceramics in Staffordshire," he said.

The plans cover both oxide and non-oxide composites, aimed at giving the UK its own capability and reducing patent and supply-chain risks. Lucideon's own news pages from 2023 show it was already working on both types, listed there as Ox/Ox and SiC/SiC, along with forming, sintering and a process called polymer impregnation pyrolysis.

Where and how much

The earmarked site is on Keele University's Science and Innovation Park, part of the planned Keele Innovation District. The park's director, Ann Pittard, said she expected the centre to bring well-paid, high-value manufacturing jobs to north Staffordshire and the wider Midlands, and called it a fitting anchor for the district.

According to Keele's 13 August announcement, the total is estimated at more than £500 million over seven to ten years, covering equipment, people, research and technology development, buildings, validation and certification. Private funding is part of the plan, but it would also need just over £200 million from government.

Lucideon would lead the scheme through a joint venture with industry partners, working with research and development partners. None of those partners has been named.

Companies House records show two companies, Oxide Ceramic Systems Limited and Non-Oxide Ceramic Systems Limited, were both incorporated on 17 July 2026 and are listed at Lucideon Group's address on Brooms Road, Stone Business Park. Their names match the two types of composite in the plan, though the Keele announcement does not mention them or say what role they would play.

The AMRICC link

At the centre of the plan is the AMRICC Centre in Stone, described in the announcement as the UK's Centre for Advanced Ceramics. Keele's announcement says it was set up with an £18.27 million grant from UK Research and Innovation's Strength in Places Fund, awarded in 2021; Lucideon's December 2023 review gives £18.27 million as the value of the four-year research programme funded through that scheme for the Midlands Industrial Ceramics Group. Lucideon hosts and runs the centre for the group as an open-access, pilot-scale facility, meaning outside organisations can use it to trial products at commercial pilot scale.

That December 2023 Lucideon review of the centre's first year described it as a £10 million facility with more than 350 pieces of equipment. It said Lucideon had invested over £4 million as the overall financial sponsor, and named Churchill China and Johnson Tiles as early adopters.

Rob Flello, chief executive of the trade body Ceramics UK, said in the announcement that the new centre would be a major investment in the UK ceramics industry and would support innovation, high-value manufacturing growth and industrial resilience.

What hasn't been said

The announcement gives no job numbers, no start date, no planning application and no detail on whether government funding has been applied for or agreed. The joint-venture partners are not named, and no customer orders are mentioned. The claim that the UK has no secure CMC supply comes from Lucideon, which stands to lead the project.

What this means for your business

  • This is a proposal, not a confirmed build. Nothing changes for local firms until the government funding question is settled, and no timetable for that has been given.
  • If it goes ahead, a project of this size over seven to ten years would need construction, engineering, testing, equipment and specialist suppliers. Firms in those trades may want to watch for planning and funding news.
  • Ceramics and materials businesses can already use the open-access AMRICC Centre in Stone to trial products at pilot scale, and it sits at the heart of the plan.

Sources

Spotted a mistake? Read our corrections policy and tell us. How this story was put together: the newsroom.

Front page →